| Solder paste inspection |
100% of prints on production builds |
Deposited volume outside 80-120% of the aperture |
Aperture area ratio above 0.66 |
| Pre-reflow optical |
100% of SMT builds after placement |
0402 and above reliably; 01005 with the high-resolution lens |
IPC-A-610H Class 2 target condition |
| Post-reflow optical |
100% of all SMT builds |
Fillet length and presence; judgement drops below 0.35 mm pitch |
IPC-A-610H Class 2 and Class 3 |
| Two-dimensional X-Ray |
Every BGA and QFN, plus a sample on legacy through-hole work |
Ball presence and bridging; void depth is not measurable |
IPC-7095 reference for voids |
| Three-dimensional CT X-Ray |
Every BGA on Class 3 and safety-related programmes |
Void percentage per ball and head-in-pillow separation |
Under 25% Class 2, under 10% Class 3 |
| Bench visual inspection |
100% at Class 3, sampling at Class 2 |
Workmanship above roughly 0.4 mm leaded pitch |
IPC-A-610H, CIS-certified inspectors |
| UV coating inspection |
Every coated assembly |
Coverage and keep-out compliance, not adhesion or cure state |
IPC-CC-830B qualification reference |
| Microsection |
Minimum 2 locations per lot |
Barrel fill, annular ring and intermetallic thickness |
IPC-6012 Class 3: 25 um minimum plated copper |
| Ionic contamination |
Once per lot by ROSE or ion chromatography |
Residue expressed as NaCl equivalent per square centimetre |
1.56 ug Class 2, 0.78 ug Class 3 |
| Dye-and-pry |
Sample after thermal cycling on BGA programmes |
Cracked balls and non-coalesced head-in-pillow joints |
IPC-9708 test method |
| In-circuit test |
100% where the volume band justifies a fixture |
Continuity, shorts and value against the netlist |
CAD netlist comparison |
| Flying probe |
100% on high-mix and prototype volumes |
The same electrical facts, without fixture pressure on the joint |
CAD netlist comparison |
| Functional test |
100% where the test plan specifies it |
Behaviour at one defined operating point |
Customer limit table with stated conditions |
| Hipot on coated assemblies |
100% on mains-connected medical and energy builds |
Dielectric breakdown or flashover across the barrier |
4000 V AC for 1 minute at 2xMOPP, 250 V |